<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:georss="http://www.georss.org/georss" xmlns:geo="http://www.w3.org/2003/01/geo/wgs84_pos#" xmlns:media="http://search.yahoo.com/mrss/"
		>
<channel>
	<title>Comments on: Hiring a Building Contractor</title>
	<atom:link href="http://lincolnct.com/2009/02/21/hiring-a-building-contractor/feed/" rel="self" type="application/rss+xml" />
	<link>http://lincolnct.com/2009/02/21/hiring-a-building-contractor/</link>
	<description>Just a simple, steet-size blog.</description>
	<lastBuildDate>Wed, 10 Feb 2010 13:01:47 +0000</lastBuildDate>
	<generator>http://wordpress.com/</generator>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
		<item>
		<title>By: macenable</title>
		<link>http://lincolnct.com/2009/02/21/hiring-a-building-contractor/#comment-147</link>
		<dc:creator>macenable</dc:creator>
		<pubDate>Fri, 24 Apr 2009 19:50:16 +0000</pubDate>
		<guid isPermaLink="false">http://lincolnct.com/2009/02/21/hiring-a-building-contractor/#comment-147</guid>
		<description>We just added a second bathroom and walk-in closet, but that required moving the master bedroom farther into the backyard.

Yes, it took longer than expected, but we had to supervise everything closely. The contractor we hired handed the job over to a lesser, who handed it down to a lesser, etc.  At one point I found the trash pickup guy down in our basement by himself with a power saw.  He had been assigned to cut a water line which was still filled with water, and it made a mess.  Also, we had to evacuate one evening when they broke the valve to the main gas line.  I could go on and on about the things they installed upside down, or the things they ignored because they thought we wouldn&#039;t notice.  The contractor said he went out of his way for us when in fact he tried to get away with what ever he could.

In retrospect, we should have made sure to contact every single one of his references, and especially his LATEST, FINISHED job, whether they were willing to provide a reference or not (we weren&#039;t).

We ARE enjoying our remodel, however.  The new bedroom is a joy to wake up in, but the building process need not have been so stressful.  (Don&#039;t short shrift the selection process!) 

Good luck with your construction.
</description>
		<content:encoded><![CDATA[<p>We just added a second bathroom and walk-in closet, but that required moving the master bedroom farther into the backyard.</p>
<p>Yes, it took longer than expected, but we had to supervise everything closely. The contractor we hired handed the job over to a lesser, who handed it down to a lesser, etc.  At one point I found the trash pickup guy down in our basement by himself with a power saw.  He had been assigned to cut a water line which was still filled with water, and it made a mess.  Also, we had to evacuate one evening when they broke the valve to the main gas line.  I could go on and on about the things they installed upside down, or the things they ignored because they thought we wouldn&#8217;t notice.  The contractor said he went out of his way for us when in fact he tried to get away with what ever he could.</p>
<p>In retrospect, we should have made sure to contact every single one of his references, and especially his LATEST, FINISHED job, whether they were willing to provide a reference or not (we weren&#8217;t).</p>
<p>We ARE enjoying our remodel, however.  The new bedroom is a joy to wake up in, but the building process need not have been so stressful.  (Don&#8217;t short shrift the selection process!) </p>
<p>Good luck with your construction.</p>